Science Dance and Music Center

Science Dance and Music Center

Client: Windward School
Partner in Charge: Maureen Sullivan

LEED Gold 2010

Windward School Music Center

Science, Math, and Music Center

The Science portion of the Science, Dance, & Music Center is designed around a core of four 1,200 SF research labs for chemistry, biology, physics and middle school science, respectively. Each lab is connected to two separate classrooms, which provide spaces for lecture and discussion, and allow instructors to use the labs for more sophisticated, hands on lessons.

Most of the Lower Level of the center is devoted to Performing Arts. To that end, the 1,700 SF Dance Studio boasts a state-of-the-art flooring, lighting and sound system, as well as a 1,600 SF Music Studio.

The Science section of the Science, Dance, & Music Center was completed in 2009 and opened that same year.

PROJECT TEAM

V. Joseph Pica – Principal
Maria Gil – Designer
Armando Lopez – Architect

Scot Oehlbert – Architect
Mimi Pon – Designer
Anne Wong – Project Manager

PROJECT INFO

Client: Windward School
Project Size: 14,000 SF
Opening Date: 2009
Construction Cost: $6,000,000

LEED Certification: Gold 2010

Photography by Randall Michelson

RELATED PROJECTS

LOS ANGELES

145 S Fairfax Ave Suite 403
Los Angeles, California 90036

Tel: (323) 653 7124

MEMBERS